{"id":19291,"date":"2026-05-13T07:17:47","date_gmt":"2026-05-13T07:17:47","guid":{"rendered":"https:\/\/taberg.de\/?p=19291"},"modified":"2026-05-14T10:16:22","modified_gmt":"2026-05-14T10:16:22","slug":"bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben","status":"publish","type":"post","link":"https:\/\/taberg.de\/en\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/","title":{"rendered":"Soil science evidence preservation in the context of construction projects"},"content":{"rendered":"<p class=\"wp-block-paragraph\">In the context of construction projects <a href=\"https:\/\/taberg.de\/en\/\"><strong>TABERG Engineers GmbH<\/strong><\/a><strong>\u2013 <\/strong>Part of <a href=\"https:\/\/siera.com\/de\/\"><strong>SIERA<\/strong><\/a> regularly deals with the preservation of pedological evidence. The aim is to systematically record, assess and document the condition of areas in connection with construction measures.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Infrastructure expansion and temporary space utilisation<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Extensive construction measures are currently being realised in connection with the expansion of infrastructure. In addition to the actual impact areas, additional construction areas are often required on neighbouring land.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These include, among others:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction site equipment areas<\/li>\n\n\n\n<li>Mounting surfaces<\/li>\n\n\n\n<li>Storage areas<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Even if these areas are not part of the direct impact area, they can still have an impact on the soil and the environment.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Consideration of environmental aspects in planning<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">As early as the planning phase, care should be taken to avoid additional interventions in natural areas wherever possible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the utilisation of such areas cannot be avoided, the following aspects are taken into account:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Soil protection<\/li>\n\n\n\n<li>Species protection<\/li>\n\n\n\n<li>Water protection<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The aim is to exclude areas that are particularly sensitive and worthy of protection as far as possible.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Importance of mitigation measures and area assessment<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Environmental mitigation measures must be reliably implemented during the construction phase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A central component of this is:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the finding<\/li>\n\n\n\n<li>the valuation<\/li>\n\n\n\n<li>the documentation<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">of the surface condition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These form the basis for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the assessment of the effectiveness of mitigation measures<\/li>\n\n\n\n<li>Recommendations for recultivation<\/li>\n\n\n\n<li>Interim management if necessary<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Timing and methods of the pedological investigations<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The pedological parameters are recorded:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>before utilisation<\/li>\n\n\n\n<li>after completion of the measure<\/li>\n\n\n\n<li>If required during the construction phase<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The following are used:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Visual documentation<\/li>\n\n\n\n<li>Field investigations<\/li>\n\n\n\n<li>Laboratory analyses<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Recording of soil physical parameters<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The following aspects, for example, can be recorded as part of field investigations:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Natural storage density of the soil<\/li>\n\n\n\n<li>Existing impairments (e.g. compaction)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">In addition, undisturbed soil samples can be taken and analysed in the laboratory, for example with regard to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Dry bulk density<\/li>\n\n\n\n<li>Pore space distribution<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Evaluation of soil chemical parameters<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to the physical properties, soil chemical parameters are also frequently analysed, including<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Yield potential (e.g. C\/N ratio, nutrient availability)<\/li>\n\n\n\n<li>Environmentally relevant pollutant compounds (e.g. heavy metals, hydrocarbons)<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Goal: Avoidance of permanent impairments<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The results of the analyses contribute to this:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>avoid permanent impairments<\/li>\n\n\n\n<li>to restore the original condition of the areas in a manner appropriate to the location<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">In this way, natural soil functions can be preserved, which are of central importance for the ecological value of these areas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Find out more about the preservation of pedological evidence and its application in construction projects on the website of <a href=\"https:\/\/taberg.de\/en\/\"><strong>TABERG Engineers GmbH<\/strong><\/a><strong>\u2013 <\/strong>Part of <a href=\"https:\/\/siera.com\/de\/\"><strong>SIERA<\/strong><\/a><br><br>In conjunction with the activities of <a href=\"https:\/\/siera.com\/de\/\"><strong>SIERA<\/strong><\/a> shows how engineering services contribute to the structured assessment of land conditions and the preservation of natural soil functions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Engineering For A Better Tomorrow<\/strong>.<\/p>","protected":false},"excerpt":{"rendered":"<p>As part of construction projects, TABERG Ingenieure GmbH - part of SIERA - is regularly involved in the preservation of pedological evidence. The aim is to,<\/p>","protected":false},"author":80,"featured_media":19299,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[74],"tags":[],"class_list":["post-19291","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bodenkundliche"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bodenkundliche Beweissicherung bei Bauvorhaben<\/title>\n<meta name=\"description\" content=\"Bodenkundliche Beweissicherung unterst\u00fctzt die Bewertung von Fl\u00e4chenzust\u00e4nden und die standortgerechte Wiederherstellung von B\u00f6den im Infrastrukturausbau.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/taberg.de\/en\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bodenkundliche Beweissicherung bei Bauvorhaben\" \/>\n<meta property=\"og:description\" content=\"Bodenkundliche Beweissicherung unterst\u00fctzt die Bewertung von Fl\u00e4chenzust\u00e4nden und die standortgerechte Wiederherstellung von B\u00f6den im Infrastrukturausbau.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/taberg.de\/en\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/\" \/>\n<meta property=\"og:site_name\" content=\"TABERG Ingenieure\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-13T07:17:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-14T10:16:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/taberg.de\/wp-content\/uploads\/2026\/05\/Taberg-Blog-Post-1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Syed Aatik Ahmed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Syed Aatik Ahmed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/\"},\"author\":{\"name\":\"Syed Aatik Ahmed\",\"@id\":\"https:\\\/\\\/taberg.de\\\/#\\\/schema\\\/person\\\/af1c7e210b67d412415f65a8d610a42b\"},\"headline\":\"Bodenkundliche Beweissicherung im Rahmen von Bauvorhaben\",\"datePublished\":\"2026-05-13T07:17:47+00:00\",\"dateModified\":\"2026-05-14T10:16:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/\"},\"wordCount\":425,\"image\":{\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/taberg.de\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Taberg-Blog-Post-1-1.jpg\",\"articleSection\":[\"Bodenkundliche\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/\",\"url\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/\",\"name\":\"Bodenkundliche Beweissicherung bei Bauvorhaben\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/taberg.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/taberg.de\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Taberg-Blog-Post-1-1.jpg\",\"datePublished\":\"2026-05-13T07:17:47+00:00\",\"dateModified\":\"2026-05-14T10:16:22+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/taberg.de\\\/#\\\/schema\\\/person\\\/af1c7e210b67d412415f65a8d610a42b\"},\"description\":\"Bodenkundliche Beweissicherung unterst\u00fctzt die Bewertung von Fl\u00e4chenzust\u00e4nden und die standortgerechte Wiederherstellung von B\u00f6den im Infrastrukturausbau.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/#primaryimage\",\"url\":\"https:\\\/\\\/taberg.de\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Taberg-Blog-Post-1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/taberg.de\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Taberg-Blog-Post-1-1.jpg\",\"width\":1200,\"height\":576},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/taberg.de\\\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/taberg.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bodenkundliche Beweissicherung im Rahmen von Bauvorhaben\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/taberg.de\\\/#website\",\"url\":\"https:\\\/\\\/taberg.de\\\/\",\"name\":\"TABERG Ingenieure\",\"description\":\"Architekten und Ingenieure\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/taberg.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/taberg.de\\\/#\\\/schema\\\/person\\\/af1c7e210b67d412415f65a8d610a42b\",\"name\":\"Syed Aatik Ahmed\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f49dc8cc038d949451508ccb8969e6c28473b086098250589970017b228e0bdd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f49dc8cc038d949451508ccb8969e6c28473b086098250589970017b228e0bdd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f49dc8cc038d949451508ccb8969e6c28473b086098250589970017b228e0bdd?s=96&d=mm&r=g\",\"caption\":\"Syed Aatik Ahmed\"},\"url\":\"https:\\\/\\\/taberg.de\\\/en\\\/author\\\/syed-aatik-ahmedsiera-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bodenkundliche Beweissicherung bei Bauvorhaben","description":"Bodenkundliche Beweissicherung unterst\u00fctzt die Bewertung von Fl\u00e4chenzust\u00e4nden und die standortgerechte Wiederherstellung von B\u00f6den im Infrastrukturausbau.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/taberg.de\/en\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/","og_locale":"en_GB","og_type":"article","og_title":"Bodenkundliche Beweissicherung bei Bauvorhaben","og_description":"Bodenkundliche Beweissicherung unterst\u00fctzt die Bewertung von Fl\u00e4chenzust\u00e4nden und die standortgerechte Wiederherstellung von B\u00f6den im Infrastrukturausbau.","og_url":"https:\/\/taberg.de\/en\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/","og_site_name":"TABERG Ingenieure","article_published_time":"2026-05-13T07:17:47+00:00","article_modified_time":"2026-05-14T10:16:22+00:00","og_image":[{"width":1200,"height":576,"url":"https:\/\/taberg.de\/wp-content\/uploads\/2026\/05\/Taberg-Blog-Post-1-1.jpg","type":"image\/jpeg"}],"author":"Syed Aatik Ahmed","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Syed Aatik Ahmed","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/#article","isPartOf":{"@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/"},"author":{"name":"Syed Aatik Ahmed","@id":"https:\/\/taberg.de\/#\/schema\/person\/af1c7e210b67d412415f65a8d610a42b"},"headline":"Bodenkundliche Beweissicherung im Rahmen von Bauvorhaben","datePublished":"2026-05-13T07:17:47+00:00","dateModified":"2026-05-14T10:16:22+00:00","mainEntityOfPage":{"@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/"},"wordCount":425,"image":{"@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/#primaryimage"},"thumbnailUrl":"https:\/\/taberg.de\/wp-content\/uploads\/2026\/05\/Taberg-Blog-Post-1-1.jpg","articleSection":["Bodenkundliche"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/","url":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/","name":"Bodenkundliche Beweissicherung bei Bauvorhaben","isPartOf":{"@id":"https:\/\/taberg.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/#primaryimage"},"image":{"@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/#primaryimage"},"thumbnailUrl":"https:\/\/taberg.de\/wp-content\/uploads\/2026\/05\/Taberg-Blog-Post-1-1.jpg","datePublished":"2026-05-13T07:17:47+00:00","dateModified":"2026-05-14T10:16:22+00:00","author":{"@id":"https:\/\/taberg.de\/#\/schema\/person\/af1c7e210b67d412415f65a8d610a42b"},"description":"Bodenkundliche Beweissicherung unterst\u00fctzt die Bewertung von Fl\u00e4chenzust\u00e4nden und die standortgerechte Wiederherstellung von B\u00f6den im Infrastrukturausbau.","breadcrumb":{"@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/#primaryimage","url":"https:\/\/taberg.de\/wp-content\/uploads\/2026\/05\/Taberg-Blog-Post-1-1.jpg","contentUrl":"https:\/\/taberg.de\/wp-content\/uploads\/2026\/05\/Taberg-Blog-Post-1-1.jpg","width":1200,"height":576},{"@type":"BreadcrumbList","@id":"https:\/\/taberg.de\/bodenkundliche-beweissicherung-im-rahmen-von-bauvorhaben\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/taberg.de\/"},{"@type":"ListItem","position":2,"name":"Bodenkundliche Beweissicherung im Rahmen von Bauvorhaben"}]},{"@type":"WebSite","@id":"https:\/\/taberg.de\/#website","url":"https:\/\/taberg.de\/","name":"TABERG Location","description":"Architects and engineers","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/taberg.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/taberg.de\/#\/schema\/person\/af1c7e210b67d412415f65a8d610a42b","name":"Syed Aatik Ahmed","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/f49dc8cc038d949451508ccb8969e6c28473b086098250589970017b228e0bdd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f49dc8cc038d949451508ccb8969e6c28473b086098250589970017b228e0bdd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f49dc8cc038d949451508ccb8969e6c28473b086098250589970017b228e0bdd?s=96&d=mm&r=g","caption":"Syed Aatik Ahmed"},"url":"https:\/\/taberg.de\/en\/author\/syed-aatik-ahmedsiera-com\/"}]}},"_links":{"self":[{"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/posts\/19291","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/users\/80"}],"replies":[{"embeddable":true,"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/comments?post=19291"}],"version-history":[{"count":3,"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/posts\/19291\/revisions"}],"predecessor-version":[{"id":19296,"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/posts\/19291\/revisions\/19296"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/media\/19299"}],"wp:attachment":[{"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/media?parent=19291"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/categories?post=19291"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/taberg.de\/en\/wp-json\/wp\/v2\/tags?post=19291"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}