NEWS

New mouth of the Emscher in Dinslaken

Already 30 years ago, the Emschergenossenschaft began with the first planning and construction measures for the renaturation of the Emscher system. In the course of this renaturation, a redesign or rerouting of the Emscher estuary into the Rhine at Dinslaken is also planned. The old technical estuary structure made of reinforced concrete is to be replaced by a naturally designed inlet about 500 m further north. For this purpose, the relocation and the hydraulic engineering design of the estuary delta were prepared in various earthworks and special civil engineering measures.

TABERG Ingenieure GmbH has been providing expert support for the "Neue Emschermündung" project since 2014. The services for soil management, geotechnical implementation support and investigation, as well as health and safety coordination, have been fully provided by TABERG Ingenieure GmbH to date.

On 09.11.2022, the "New Emscher Estuary" was ceremoniously opened by NRW Minister President Hendrik Wüst and the rebuilt estuary delta was flooded.

Leave a Reply

Your email address will not be published. Required fields are marked *