ADD ANYTHING HERE OR JUST REMOVE IT...
TABERG Ingenieure
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Management
    • Group
  • Expertise
    • Environment
    • Mining
    • Geotechnics
  • Solutions
  • Location
  • PROJECTS
  • Blog
  • Career
    • Vacancies
    • Vision & Mission
    • Employee Benefits
    • Goodwill
    • Leadership Development Programme
  • Login
en_GB EN
en_GB EN de_DE DE
TABERG Ingenieure
en_GB EN
en_GB EN de_DE DE
Menu
HomeSoil Extension, new construction and conversion measures, Wunstorf airfield
Previous product
Versmannkai Ost, Baufeldfreimachung BF 102-110
Versmannkai East, site clearance BF 102-110
Back to products
Next product
Eigenüberwachung Deponie Castrop-Rauxel
Self-monitoring of Castrop-Rauxel landfill

Extension, new construction and conversion measures, Wunstorf airfield

Compare
Add to wishlist
  • Description
Description

Period: Since 2012

Field of activity: Historical investigation of explosive ordnance,

Technical construction management and local construction supervision for explosive ordnance disposal in accordance with the German Ordinance on Explosive Ordnance Disposal (Ordinance on Explosive Ordnance Disposal).

Construction guidelines for explosive ordnance disposal

Scope of services:

  • Creation of a historical-genetic reconstruction
  • Planning services
  • Preparation of clearance concepts, consulting services
  • Participation in construction meetings
  • Coordination/control of explosive ordnance clearance
  • Preparation of work/safety plans
  • Preparation of tender documents, assistance in awarding contracts
  • Cost/invoice control
  • Local construction supervision

Short description: With the planned stationing of the Airbus A 400 M transport aircraft at the Wunstorf military airfield in the area of responsibility of the State Construction Management of Lower Saxony, an adaptation of the infrastructure is necessary. For this purpose, extensive expansion, new construction and conversion measures have been carried out on the existing building and technical stock or are still being implemented. Due to its previous use in World War II as a Wehrmacht airbase, the site is classified as contaminated with explosive ordnance. History has shown that the area was hit in the course of bombing raids. The main cause is the burial of explosive ordnance. Therefore, explosive ordnance clearance is required for construction work involving ground intervention. Computer-aided area soundings, borehole soundings, explosive ordnance clearance during construction or at specific points and the use of a separation system are used. Since 2012, M&P has been responsible for the necessary technical construction management and local construction supervision of the explosive ordnance clearance.

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

Orienting investigation of old deposits in Tündern

Soil
Compare
Quick view
Add to wishlist
Close

Historical exploration of the former Kurhessen barracks, Hann. Münden

Soil
Compare
Quick view
Add to wishlist
Close

Orienting investigation (Phase IIa) of the Bad Arolsen site shooting range, Bad Arolsen

Soil
Expertise

Environment
Mining
Geotechnics
Group members

M&P Group
M&P Engineering Company
seecon engineers
M&P Project
Prof. Burmeier Engineering Company
T&P Consulting Engineers
M&P Water

Group members

Dürselen Real Estate
M&P Climate
M&P Environmental Technology 
M&P Energy 
ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH

Contact

TABERG Engineers GmbH
To the Pier 77
D-44536 Lünen

Tel.: +49 (0) 23 198 7073 0
Fax: +49 (0) 23 198 7073 17
E-mail: info@taberg.de
Imprint | Privacy policy
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Management
    • Group
  • Expertise
    • Environment
    • Mining
    • Geotechnics
  • Solutions
  • Location
  • PROJECTS
  • Blog
  • Career
    • Vacancies
    • Vision & Mission
    • Employee Benefits
    • Goodwill
    • Leadership Development Programme
  • Login