Project details
Project description: An approx. 500 m long conveyor bridge construction connected the former Westerholt colliery site with the nearby former Hassel coking plant site. Among other things, the belt bridge ran over a multi-lane motorway, crossed a regional railway line and crossed an allotment garden site in use. With the closure of the mine and the associated coking plant, the conveyor bridge also became dispensable from a technical and operational point of view and had to be dismantled in a controlled manner.
Our services: Technical investigation of the structures, preparation of a pollutant register and a remediation plan, preparation of a dismantling and construction logistics concept, preparation of the tender documents, construction supervision / expert monitoring of the overall measure.
Term: May 2017 until December 2018
Industry of the client: Mining company