ADD ANYTHING HERE OR JUST REMOVE IT...
TABERG Ingenieure
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Management
    • Group
  • Expertise
    • Environment
    • Mining
    • Geotechnics
  • Solutions
  • Location
  • PROJECTS
  • Blog
  • Career
    • Vacancies
    • Vision & Mission
    • Employee Benefits
    • Goodwill
    • Leadership Development Programme
  • Login
en_GB EN
en_GB EN de_DE DE
TABERG Ingenieure
en_GB EN
en_GB EN de_DE DE
Menu
HomeSoil Versmannkai East, site clearance BF 102-110
Previous product
Historische Erkundung ehem. Kurhessenkaserne, Hann. Münden
Historical exploration of the former Kurhessen barracks, Hann. Münden
Back to products
Next product
Stadtteilentwicklung Grasbrook
Grasbrook district development

Versmannkai East, site clearance BF 102-110

Compare
Add to wishlist
  • Description
Description
Period: 2016 - 2018
Field of activity: Explosive ordnance clearance
Scope of services: Consultancy services, planning services, tendering, participation in award of contract, construction supervision
Short description: Versmannkai Ost is located in the Elbbrücken quarter of HafenCity. This is currently being developed into a new district with residential and commercial development.

The construction sites 102, 105, 108 and 110 were located in a former water area that had not yet been explored. The aim of the work was to check the unexplored construction sites with suspected unexploded bombs down to a depth of -9.5 m below sea level (-15 m below ground level) by means of borehole probing and to achieve clearance.

In the run-up to the exploratory work, existing quay installations (quay slab, concrete spar, sheet pile wall) had to be demolished in some areas. The sheet pile wall was only partially removed. The soundings were carried out by means of a triaxial magnetometer, supplemented by an active method (here 4R-EM) and borehole georadar in order to determine the

The aim was to keep civil engineering costs for the recovery as low as possible. The recovery at greater depths was carried out by means of large-hole drilling and diving operations.

The terrain was adjusted by backfilling the excavation pits and modelling to contractually agreed transfer heights.

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

Conversion of former BW hospital Rostrup, Bad Zwischenahn

Soil
Compare
Quick view
Add to wishlist
Close

Expansion of the Kiel Canal, test field exploration for explosive ordnance

Soil
Compare
Quick view
Add to wishlist
Close

Orienting investigation (Phase IIa) of the Bad Arolsen site shooting range, Bad Arolsen

Soil
Expertise

Environment
Mining
Geotechnics
Group members

M&P Group
M&P Engineering Company
seecon engineers
M&P Project
Prof. Burmeier Engineering Company
T&P Consulting Engineers
M&P Water

Group members

Dürselen Real Estate
M&P Climate
M&P Environmental Technology 
M&P Energy 
ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH

Contact

TABERG Engineers GmbH
To the Pier 77
D-44536 Lünen

Tel.: +49 (0) 23 198 7073 0
Fax: +49 (0) 23 198 7073 17
E-mail: info@taberg.de
Imprint | Privacy policy
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Management
    • Group
  • Expertise
    • Environment
    • Mining
    • Geotechnics
  • Solutions
  • Location
  • PROJECTS
  • Blog
  • Career
    • Vacancies
    • Vision & Mission
    • Employee Benefits
    • Goodwill
    • Leadership Development Programme
  • Login